Case Studies
SeaDragon Offshore
SeaDragon Offshore – ’01 OBAN B’ – Rubber Lined CL. 150 / 2″ to 20″ WCB / CF8M & DI / AB2 About SeaDragon Offshore – ’01 OBAN B’ ‘Oban B’, a deepwater, harsh environment semisubmersible Read more…
SeaDragon Offshore – ’01 OBAN B’ – Rubber Lined CL. 150 / 2″ to 20″ WCB / CF8M & DI / AB2 About SeaDragon Offshore – ’01 OBAN B’ ‘Oban B’, a deepwater, harsh environment semisubmersible Read more…
Total – Tyra Redevelopment Project Rubber Lined CL. 150 Butterfly valves / ASTM A995 SDSS / TITANIUM / Sizes 2” to 24” & Tri-function Air Valves ASTM A995 SDSS 8 packages About Total – Tyra Redevelopment Tyra gas Read more…
TAQA – Tern Alpha Return to Drilling Rubber Lined CL. 150 WCB / AB2 & CF8M About TAQA – Tern Alpha Tern Alpha is a fixed installation serving as a manned drilling and production installation for the Read more…
MV23 – Rubber Lined & High Performance CL. 150 WCB/ SDSS & CF8M/CF8M About MODEC – FPSO Cidade De São Paulo MV23 The FPSO Cidade de São Paulo MV23 is deployed in the Sapinhoá (formerly Read more…
Rubber Lined CL. 150 WCB / 316 About Hæwene Brim FPSO Since 1999, the Hæwene Brim Floating Production Storage and Offloading (FPSO) installation has been operational at the Pierce field in the UK sector of Read more…
36″ High Performance CL. 150 WCB / 316 Specification The Chevron Project was a turnaround project for which we supplied 1 off 36” double offset high performance butterfly valve for cooling water service. Materials were Read more…
42″ CL. 150 WCB / AB2 About Equinor – Mongstad Refinery “The first part of the refinery at Mongstad in Nordhordland was opened for operations in 1975. After the facility was expanded in 1989, the Read more…
Multi supply across global assets About BP Angola Block 18: Greater Plutonio Block 18, an area of 5,000 sq km in water depths of 500 – 1,600 metres. Block 18 is located in the Angolan offshore, Read more…
Multi supply Framework from 2007 to 2017 (Total Acquisition) Present supply continues to North Oil JV QATAR About Al Shaheen There are 30 platforms, 300 operational production and water injection wells, as well as 26 exploration and Read more…